Skip to main content
Rose Library and the Music Library are closed through July 5 as we move into Carrier Library. The ETMC and Rose's 24/7 Space are still open, and our online services and resources remain available – Read More about Rose Library and the Music Library are closed through July 5 as we move into Carrier Library. The ETMC and Rose's 24/7 Space are still open, and our online services and resources remain available

Exciting Progress on Carrier Library Construction

Posted July 19, 2023 in Carrier Renovation News, JMU Libraries News

If you’ve walked by Carrier Library lately, you’ve probably noticed some changes!

The left picture shows the exterior of the 1980s portion of the building being removed! The beautiful curved entrance on the right is an artist’s rendering of what that section of the building will look like when it’s finished.

Follow us on social media for more construction updates and check out our award-winning Carrier Renovation and Expansion website for more information.